주요실적
PROJECT NAME | AREA | CAPACITY | YEAR | PRODUCT | CUSTOMER | EPC |
---|---|---|---|---|---|---|
KOREA SOUTH-EAST POWER | KOREA SOUTH-EAST POWER | DEBRISFILTER TER.EL | 2010.MAR | 800 MW | KOREA (REPUBLIC OF) |
YEONGHEUN THERMAL POWER UNIT 1 |
PETROFAC-GS JOINT VENTURE | GASCO | FUSION BONDED EPOXY LINED PIPING(1ST BM) | 2010.AUG | - | UAE | RUWAIS 4TH NGL PROJECT(JV) |
PETROFAC-GS JOINT VENTURE | GASCO | FUSION BONDED EPOXY LINED PIPING(2ND BM) | 2010.AUG | - | UAE | RUWAIS 4TH NGL PROJECT(JV) |
JGC | TAGANITO THPAL | RUBBER LINED & SHOP SPOOL FABRICATION |
2010.AUG | 50,000t (Nickel and Cobalt) | PHILIPPINES | TAGANITO THPAL PROJECT |
PETROFAC-GS JOINT VENTURE | GASCO | GLASS FLAKE RESIN LINED PIPING(1ST BM) | 2010.SEP | - | UAE | RUWAIS 4TH NGL PROJECT(JV) |
SK ecoengineering | SK ecoengineering | COOLING WATER PIPING | 2010.NOV | 833 MW | KOREA (REPUBLIC OF) |
OSEON CCPP |
GS E&C | AL SUWADI POWER Company SAOC Sultanate |
SHOP FAB.FOR RUBBER /MODIFIED EPOXY LINED PIPING |
2011.JAN | 744 MW | OMAN | OMAN BARKA 3 IPP PROJECT |
GS E&C | AL SUWADI POWER Company SAOC Sultanate |
SHOP FAB.FOR RUBBER /MODIFIED EPOXY LINED PIPING |
2011.JAN | 744 MW | OMAN | OMAN SOHAR 2 IPP PROJECT |
SK ecoengineering | SK ecoengineering | UG CS EXTERNAL COATIN PIPING | 2011.NOV | 59 MW | KOREA (REPUBLIC OF) |
KIMCHEON GROUP ENERGY |
GS E&C | GS E&C | MODIFIED EPOXY LINED SHOP FAB.PIPING FOR CW PIPING | 2012.JAN | 415 MW | KOREA (REPUBLIC OF) |
BUGOK CCPP UNIT 3 |
DL E&C | SAUDI ELECTRICITY COMPANY | PIPE SPOOL FAB & RUBBER LINED PIPING |
2012.MAY | 1200 MW | SAUDI ARABIA | SHOIABA Ⅱ CCPP |
SEONGHWA | ALGHANIM INTERNATIONA GENERAL TRAD.&CONT.CO | RUBBER LINED & SHOP SPOOL FABRICATION |
2012.JUN | 1600 MW | KUWAIT | AZ ZOUR SOUTH CCGT-2 |
DL E&C | DL E&C | RUBBER LINED PIPING & MODIFIED EPOXY LINED SPOOL FABRICATION | 2012.AUG | 1560 MW | KOREA (REPUBLIC OF) |
POCHEON CCPP |
DL E&C | DL E&C | PIPE SPOOL FAB & GLASS FLAKE LINING | 2012.AUG | 950 MW | KOREA (REPUBLIC OF) |
PYEONGTAEK CCPP UNIT 2 |
DL E&C | DL E&C | RUBBER LINED PIPING & GLASS FLAKE LINED SHOP SPOOL FABRICATION | 2012.NOV | 948 MW | KOREA (REPUBLIC OF) |
ULSAN CCPP |
GS E&C | GS E&C | MODIFIED EPOXY LINED SHOP FAB.PIPING FOR CW PIPING | 2012.NOV | 407 MW | KOREA (REPUBLIC OF) |
ANDON CCPP |
DL E&C | DL E&C | PIPE SPOOL FAB & PP LINED PIPING | 2012.FEB | 948 MW | KOREA (REPUBLIC OF) |
ULSAN CCPP |
GS NEOTEK | GS E&C | RUBBER LINED PIPING & MODIFIED EPOXY LINED SPOOL FABRICATION | 2013.JAN | 1740 MW | KOREA (REPUBLIC OF) |
YEONGHEUN THERMAL POWER UNIT 5,6 |
KOREA WESTERN POWER | KOREA WESTERN POWER | GLASS FLAKE RESIN LINED & P.E COAT & SHOP FAB. PIPING | 2013.FEB | 1020 MW x 2 | KOREA (REPUBLIC OF) |
TAEAN THERMAL POWER UNIT 9,10 |
KOREA WESTERN POWER | KOREA WESTERN POWER | GLASS FLAKE RESIN LINED & P.E COAT & SHOP FAB. PIPING | 2013.FEB | 380 MW | KOREA (REPUBLIC OF) |
TAEAN THERMAL POWER IGCC |
GS E&C | KOREA WESTERN POWER | GLASS FLAKE RESIN LINED & P.E COAT & SHOP FAB. PIPING | 2013.MAY | 380 MW | KOREA (REPUBLIC OF) |
TAEAN THERMAL POWER IGCC |
KOREA SOUTH-EAST POWER | KOREA SOUTH-EAST POWER | RUBBER LINED & SHOP SPOOL FABRICATION |
2013.MAY | 1050 MW | KOREA (REPUBLIC OF) |
YEONGHEUN THERMAL POWER UNIT 5,6 |
DL E&C | SAUDI ELECTRICITY COMPANY | RUBBER LINED & SHOP SPOOL FABRICATION |
2013.MAY | 1200 MW | SAUDI ARABIA | SHOIABA Ⅱ CCPP |
SEONGHWA | SWCC | PIPE SPOOL FAB (CS ,P22) | 2013.JUN | 2400 MW | SAUDI ARABIA | RAS A KHAIR D132 |
DONGYAN STEEL PIPE | KOREA SOUTH-EAST POWER | GLASS FLAKE RESIN LINED & P.E COAT & SHOP FAB. PIPING | 2013.JUN | 1000 MW | KOREA (REPUBLIC OF) |
SAMCHEOK GREEN POWER |
DONGYAN STEEL PIPE | GS E&R | GLASS FLAKE RESIN LINED & P.E COAT & SHOP FAB. PIPING | 2013.JUL | 1190 MW | KOREA (REPUBLIC OF) |
BUKPYEON THERMAL POWER |
DAEWOO E&C | OCP SA | RUBBER LINED & SHOP SPOOL FABRICATION |
2013.JUL | 1320 MW | MOROCCO | MOROCCO JL FERTILIZER |
GS E&C | GS EPS | RUBBER LINED PIPING & MODIFIED EPOXY LINED SPOOL FABRICATION | 2014.JAN | 105 MW | KOREA (REPUBLIC OF) |
DANGJIN BIOMASS |
HANWHA E&C | HANWHA E&C | CW RUBBER LININE PIPING | 2014.FEB | 2 MILLION TON | SAUDI ARABIA | MA’ADEN AD DUWAHI GRAVITY CIL GOLD |
STX HEAVY INDUSTRIES | KOREA EAST-WEST POWER | RUBBER LINED PIPING & CERAMIC LINED SPOOL FABRICATION | 2014.MAR | 2000 MW | KOREA (REPUBLIC OF) |
DANGJIN THERMAL POWER UNIT 9,10 |
HANWHA E&C | KEPCO E&C | MODIFIED EPOXY LINED & P.E COATED & SHOP FAB.PIPING (C.W.P) | 2014.APR | 436 MW | KOREA (REPUBLIC OF) |
OSAN CHP |
DL E&C | AL JUBAIL PETROCHEMICA COMPANY | REFRACTORY LINED PIPING | 2014.JUL | 11040 m3/d 871 m3/d |
SAUDI ARABIA | SAUDI ELASTORMERS |
SK ecoengineering | SK ecoengineering | CS INTERNAL EPOXY COATED PIPING | 2014.JUN | 300 MW | PANAMA | PACO POWER PLANT |
SK ecoengineering | KOREA WESTERN POWER | MODIFIED EPOXY LINED & P.E COAT & SHOP FAB. PIPING | 2014.FEB | 460 MW | KOREA (REPUBLIC OF) |
WIRYE CCPP |
SK ecoengineering | KOREA WESTERN POWER | RUBBER LINED & SHOP SPOOL FABRICATION |
2015.JAN | 1000 MW | KOREA (REPUBLIC OF) |
TAEAN THERMAL POWER UNIT 9,10 |
DOOSAN ENERBILITY | KOREA MIDLAND POWER | SHOP SPOOL FABRICATION | 2015.JAN | 1000 MW | KOREA (REPUBLIC OF) |
SHIN-BORYEON POWER UNIT 1,2 |
SK ecoengineering | PMP CO.,LTD | MODIFIED EPOXY LINED SPOO FABRICATION | 2015.JAN | 1800 MW | KOREA (REPUBLIC OF) |
JANGMOON CCPP |
GS E&C | KOREA MIDLAND POWER | MODIFIED EPOXY LINED & P.E COAT & SHOP FAB. PIPING | 2015.JUN | 902 MW | KOREA (REPUBLIC OF) |
DANGJIN 4 CCPP |
DL E&C | Pagbilao Energy Corporation | SHOP FABRICATION LINED & GLASS FLAKE LINED & PIPING | 2015.JUN | 420 MW | PHILIPPINES | Pagbilao 420 MW Unit 3 Coal-Fired Power Project |
SEONGHWA | C.W PIPE SHOP SPOO FABRICATION | 2015.JUN | 3100 MW | SAUDI ARABIA | YANBU Ⅲ | |
STX HEAVY INDUSTRIES | GS DEP | GLASS FLAKE RESIN LINED & RUBBER LINED & SHOP FAB. PIPING | 2015.FEB | 1190 MW | KOREA (REPUBLIC OF) |
BUKPYEON THERMAL POWER UNIT 1,2 |
SAMSUN C&T | OCP SA | RUBBER LINED & SHOP SPOOL FABRICATION |
2015.FEB | 1320 MW | MOROCCO | MOROCCO JL FERTILIZEOR P2 & P5 |
DL E&C | VIETNAM OIL AND GAS GROUP | RUBBER LINED PIPING & MODIFIED EPOXY LINED SPOOL FABRICATION | 2015.APR | 1200 MW | VIETNAM | THAI BINH 2 |
SAMSUN C&T | OCP SA | RUBBER LINED & SHOP SPOOL FABRICATION |
2015.APR | 1320 MW | MOROCCO | MOROCCO JL FERTILIZER P5 |
DL E&C | Pagbilao Energy Corporation | RUBBER LINED & SHOP SPOOL FABRICATION |
2015.AUG | 420 MW | PHILIPPINES | PAGBILAO 420 MW UNIT 3 COAL-FIRED POWER |
SK ecoengineering | PMP CO.,LTD | CS INTERNAL LIQUID EPOXY COATED PIPING | 2015.MAY | 1800 MW | KOREA (REPUBLIC OF) |
JANGMOON CCPP |
DL E&C | TNB WESTERN ENERGY BERHAD | SHOP FABRICATION LINED PIPING(A/G) | 2015.MAY | 1000 MW | MALAYSIA | MALAYSIA TNB FAST TRACK 3A |
SK ecoengineering | KOREA WESTERN POWER | MODIFIED EPOXY LINED & P.E COAT & SHOP FAB. PIPING | 2015.SEP | 460 MW | KOREA (REPUBLIC OF) |
WIRYE CCPP |
POSCO E&C | KOREA SOUTHERN POWER | UG CS EXTERNA COATINGPIPING | 2016.FEB | 400 MW | KOREA (REPUBLIC OF) |
YOUNGNAM THERMAL POWER |
POSCO E&C | KOREA SOUTHERN POWER | MODIFIED EPOXY LINED SHOP FAB.PIPING FOR CW PIPING | 2016.FEB | 400 MW | KOREA (REPUBLIC OF) |
YOUNGNAM THERMAL POWER |
HYUNDAI E&C | SARULLA OPERATIONS LTD. | STEAM TURBINE EXHAUST CONNECTION | 2016.MAR | INDONESIA | SARULLA GEOTHERMAL POWER | |
GS E&C | GS POWER | RUBBER LINED PIPING & GLASS FLAKE LINED SHOP SPOOL FABRICATION | 2016.MAR | 500 MW | KOREA (REPUBLIC OF) |
ANYANG CHP |
DL E&C | Pagbilao Energy Corporation | SHOP FAB. GLASS FLAKE & RUBBER LINED PIPING | 2016.APR | 420 MW | PHILIPPINES | PAGBILAO 420MW UNIT 3 COAL FIRED POWER PJT |
DL E&C | TNB WESTERN ENERGY BERHAD | SHOP FAB. LINED PIPIN (A/G) | 2016.JUN | 1000 MW | MALAYSIA | TNB FAST TRACK 3A |
GS E&C | GS POWER | GLASS FLAKE LINED & RUBBER LINED | 2016.JUL | 1450 MW | KOREA (REPUBLIC OF) |
POCHEON CCPP |
POSCO E&C | AES PHILIPINES | SHOP SPOOL FABRICATION | 2016.AUG | 995 MW | PHILIPPINES | MASINLOC POWER PLANT EXPANSION |
GS E&C | GS POWER | LINED PIPING | 2016.AUG | 500 MW | KOREA (REPUBLIC OF) |
ANYANG CHP |
GS E&C | GS POWER | SHOP FAB PIPING for CW SYSTEM | 2016.AUG | 1450 MW | KOREA (REPUBLIC OF) |
POCHEON CCPP |
SK ecoengineering | GOSEONG GREEN POWER | UG CS INT/EXT COATED PIPING | 2016.FEB | 2080 MW | KOREA (REPUBLIC OF) |
GOSEON HAI CCPP |
SK ecoengineering | GOSEONG GREEN POWER | CS INTERNAL PP LINED PIPING | 2016.NOV | 2080 MW | KOREA (REPUBLIC OF) |
GOSEON HAI CCPP |
GS E&C | GS POWER | GLASS FLAKE LINED & RUBBER LINED | 2016.NOV | 1450 MW | KOREA (REPUBLIC OF) |
POCHEON CCPP |
JOHN COCKERILL HAMON | GS POWER | RISE PIPE COATING & MANUFACTURING | 2017.FEB | 500 MW | KOREA (REPUBLIC OF) |
ANYANG CHP |
DL E&C | SAN BUENAVENTURA POWER | SHOP FAB. LINED PIPING | 2017.FEB | 460 MW | PHILIPPINES | SPBL(QUEZON) |
SK ecoengineering | GOSEONG GREEN POWER | CS INTERNAL PP LINED PIPING | 2018.FEB | 2080 MW | KOREA (REPUBLIC OF) |
GOSEON HAI CCPP |
SK ecoengineering | GOSEONG GREEN POWER | UG CS INT/EXT COATED PIPING | 2018.MAY | 2080 MW | KOREA (REPUBLIC OF) |
GOSEON HAI CCPP |
DL E&C | KOREA MIDLAND POWER | VACUUM CLEANING PIPING | 2018.JUL | 1000 MW | KOREA (REPUBLIC OF) |
SHIN-SEOCHEON THERMAL POWER |
SEONGHWA | GOSEONG GREEN POWER | SHOP SPOOL FABRICATION | 2018.JUL | 2080 MW | KOREA (REPUBLIC OF) |
GOSEON HAI CCPP |
DOOSAN ENERBILITY | KOREA MIDLAND POWER | SHINSEOCHEON FGD PIPING SPOOL | 2018.OCT | 1000 MW | KOREA (REPUBLIC OF) |
SHIN-SEOCHEON THERMAL POWER |
GS E&C | GS EPS | LINED COATED PIPING | 2018.OCT | 105 MW | KOREA (REPUBLIC OF) |
DANGJIN BIOMASS UNIT 2 |
SAMSUN C&T | GANGNEUNG ECO POWER | LINED PIPING SPOO FABRICATION | 2018.NOV | 2080 MW | KOREA (REPUBLIC OF) |
GANGNEUN ANIN THERMAL POWER |
SK ecoengineering | GOSEONG GREEN POWER | CS INTERNAL RUBBER LINED PIPING | 2018.NOV | 2080 MW | KOREA (REPUBLIC OF) |
GOSEON HAI CCPP |
KC COTTRELL | GOSEONG GREEN POWER | Lining pipe spool with mill slurry tank | 2018.FEB | 2080 MW | KOREA (REPUBLIC OF) |
GOSEON HAI CCPP |
KOREA COATING STEE PIPE | GANGNEUNG ECO POWER | SHOP FAB. LINED PIPING | 2019.JAN | 2080 MW | KOREA (REPUBLIC OF) |
GANGNEUN ANIN THERMAL POWER |
KOREA COATING STEE PIPE | GANGNEUNG ECO POWER | PIPE WELDING | 2019.JAN | 2080 MW | KOREA (REPUBLIC OF) |
GANGNEUN ANIN THERMAL POWER |
DL E&C | TNB WESTERN ENERGY BERHAD | SHOP FAB. LINED PIPING | 2019.FEB | 1000 MW | MALAYSIA | TNB FAST TRACK 3A |
GS E&C | GS POWER | LINED PIPING | 2019.APR | 500 MW | KOREA (REPUBLIC OF) |
ANYANG CHP UNIT 2 |
COWAY ENTECH | KOREA WESTERN POWER | DUPLEX PIPING SPOOL | 2019.APR | KOREA (REPUBLIC OF) |
TAEAN #1~8 Zero Liquid discharge | |
SK ecoengineering | GOSEONG GREEN POWER | CS INTERNAL PP LINED PIPING | 2019.MAY | 2080 MW | KOREA (REPUBLIC OF) |
GOSEON HAI CCPP |
DYPNF | GOSEONG GREEN POWER | ASH PIPING | 2019.JUN | 2080 MW | KOREA (REPUBLIC OF) |
GOSEON HAI CCPP |
DL E&C | TNB WESTERN ENERGY BERHAD | SHOP FAB. LINED PIPING | 2019.AUG | 1000 MW | MALAYSIA | TNB FAST TRACK 3A |
SK ecoengineering | KOREA NATIONAL OI COPORATION | ULSAN RESERVE OIL BASE | 2019.AUG | KOREA (REPUBLIC OF) |
ULSAN RESERCE BASE | |
SEONGHWA | GOSEONG GREEN POWER | STEAM BLOWING PIPING | 2019.SEP | 2080 MW | KOREA (REPUBLIC OF) |
GOSEON HAI CCPP |
BDI | GOSEONG GREEN POWER | SGT355 PIPE SPOOL | 2019.OCT | 2080 MW | KOREA (REPUBLIC OF) |
GOSEON HAI CCPP |
DYPNF | GOSEONG GREEN POWER | DUPLEX PIPING SPOOL | 2020.JAN | 2080 MW | KOREA (REPUBLIC OF) |
GOSEON HAI CCPP |
DOOWON STEEL | LOTTE E&C | SHOP SPOOL FABRICATION | 2020.JAN | 275 MW | INDONESIA | RIAU GFPP PJT. |
SEHWA ENSTECH | KOREA SOUTH-EAST POWER | SHOP SPOOL FABRICATION | 2020.APR | KOREA (REPUBLIC OF) |
SAMCHEON THERMAL POWER UNIT 5,6 | |
SK ecoengineering | YEOJU ENERGY SERVICE | CS INTERNAL EPOXY COATED PIPING | 2020.MAY | 1004 MW | KOREA (REPUBLIC OF) |
YEOJU CCPP |
SK ecoengineering | SK HYNIX | CS INTERNAL EPOXY COATED PIPING | 2020.JUN | 585 MW | KOREA (REPUBLIC OF) |
SEC (SMART ENERGY CENTER) ICHEON |
GS E&C | GS POWER | SHOP SPOOL FABRICATION | 2020.JUL | 500 MW | KOREA (REPUBLIC OF) |
ANYANG CHP UNIT 2 |
GS E&C | GS POWER | SHOP SPOOL FABRICATION | 2020.JUL | 500 MW | KOREA (REPUBLIC OF) |
ANYANG CHP UNIT 2 |
DOOSAN ENERBILITY | SC BLUEPOWER | RUBBER LINING SPOOL | 2020.FEB | 1050 MW * 2 | KOREA (REPUBLIC OF) |
SAMCHEOK THERMAL POWER |
DOOSAN ENERBILITY | SC BLUEPOWER | FGD SPOOL | 2020.FEB | 1050 MW * 2 | KOREA (REPUBLIC OF) |
SAMCHEOK THERMAL POWER |
DOOSAN ENERBILITY | SC BLUEPOWER | SHOP SPOOL FABRICATION | 2020.FEB | 1050 MW * 2 | KOREA (REPUBLIC OF) |
SAMCHEOK THERMAL POWER |
DOOSAN ENERBILITY | SC BLUEPOWER | GLASS FLAKE LINED SPOOL | 2020.FEB | 1050 MW * 2 | KOREA (REPUBLIC OF) |
SAMCHEOK THERMAL POWER |
COWAY ENTECH | GANGNEUNG ECO POWER | RUBBER LINING SPOOL | 2021.APR | 2080 MW | KOREA (REPUBLIC OF) |
GANGNEUN ANIN THERMAL POWER |
DOOSAN ENERBILITY | KOREA WESTERN POWER | CW SPOOL | 2021.AUG | 510 MW | KOREA (REPUBLIC OF) |
KIMPO CHP |
LOTTE E&C | NAEPO GREEN ENERGY | CW SPOOL | 2021.AUG | 555 MW | KOREA (REPUBLIC OF) |
NAEPO CHP |
HJ SHIPBUILDING & CONSTRUCTION | KOREA SOUTHERN POWER | CW SPOOL | 2021.NOV | 597 MW | KOREA (REPUBLIC OF) |
SHIN-SEJONG CCPP |
SK ecoengineering | ULSAN GPS | UG CS COOLING WATER PIPING | 2021.FEB | 1227 MW | KOREA (REPUBLIC OF) |
ULSAN GPS |
LOTTE E&C | KOREA DISTRICT HEATIN CORP. | CW SPOOL | 2021.FEB | 200 MW | KOREA (REPUBLIC OF) |
ECO-FRIENDLY ENERGY IMPROVEMENT (CHEONGJU) |
HYUNDAI ENGINEERING | LOTTER CHEMICAL | GLASS FLAKE LINED SPOOL | 2022.MAR | - | INDONESIA | LINE PKG#1 |
LOTTE E&C | KOREA DISTRICT HEATIN CORP. | CW & SHOP FAB. SPOO (BOP) | 2022.MAR | 200 MW | KOREA (REPUBLIC OF) |
ECO-FRIENDLY ENERGY IMPROVEMENT (DAEGU) |
DYPNF | SC BLUEPOWER | SHOP SPOOL FABRICATION | 2022.MAR | 1050 MW x 2 | KOREA (REPUBLIC OF) |
SAMCHEOK THERMAL POWER UNIT 1,2 |
SK ecoengineering | SK HYNIX | CS INTERNAL EPOXY COATED PIPING | 2022.JUN | 585 MW | KOREA (REPUBLIC OF) |
SEC (SMART ENERGY CENTER) CHEONGJU |
POSCO E&C | POSCO INTERNATIONAL | FIRE FIGHTING SPOO FABRICATION | 2022.SEP | 200,000㎘ x 2 | KOREA (REPUBLIC OF) |
KWANGYANG LNG TERMINAL |
SGC eTEC E&C | KWANGYANG GREEN ENERGY | CW SPOOL | 2022.NOV | 110 MW x 2 | KOREA (REPUBLIC OF) |
KWANGYANG BIOMASS |
SAE-A STX ENTECH | BP | PIPING FREFABRICATION | 2022.NOV | 6 MILLION B/D | IRAQ | PWRI FACILITY PHASE 1 |
SK ecoengineering | SK GAS | CS INTERNAL PE LINED PIPING | 2022.DEC | KOREA (REPUBLIC OF) |
CEC (CLEAN ENERGY COMPLEX) | |
POSCO E&C | KOREA EAST-WEST POWER | CW PIPING | 2023.APR | 561 MW x 2 | KOREA (REPUBLIC OF) |
UMSEONG CCPP |
KOREA WESTERN POWER | KOREA WESTERN POWER | CW PIPING | 2023.APR | 500 MW | KOREA (REPUBLIC OF) |
KUMI LNG POWER PLANT |